Location
-
Area under construction
-
Total Estimated ExpenditureDisclaimer:
Values have been calculated using the average cost in each location.
Actual cost will vary depending upon
- a. Desired quality and finishing
- b. Existing /current cost of material & labour
Arrived cost is for reference purpose only.
-
Pre-Construction Stage
-
Design Fees
-
Borewell
-
-
Construction Stage
-
Marking/Excavation
-
Sand
-
Water
-
Steel / Reinforcement
-
Stone aggregates
-
Concrete Contractor
-
Formwork / Frame work
-
Plumbing / Sanitation
-
Electrical Work
-
Compound Wall / Door Entrance
-
Soil
-
Cement
-
-
Post-Construction Stage
-
Painting
-
Exterior Flooring
-
Doors & Windows
-
Miscellaneous
-
Calculate
Reset
Print
Go Back
- Design Fees 4%
- Marking/Excavation 3%
- Sand 4%
- Water 1%
- Steel / Reinforcement 4%
- Bricks 9%
- Stones 5%
- Concrete Contractor 9%
- Formwork / Frame work 3%
- Borewell 3%
- Painting 10%
- Plumbing / Sanitation 7%
- Electrical Work 5%
- Exterior Flooring 6%
- Compound Wall / Door Entrance 2%
- Doors & Windows 3%
- Miscellaneous 8%
- Soil 2%
- Cement 12%